Product tour

Take the shift yourself.

Below is the operator console, replaying one distribution centre from 06:00 to 15:00 at 60 times real speed. Stop it, drag it, change what happens next. It is not a video and there is nothing to book first.

Operator

Built for the person running the floor.

One screen, for the person who has to make the call.

Loading the day…
Nine hours of one distribution centre — 35,000 events across three versions of the same morning.
The 5 views

Learn

Process explorer
The flow the operation actually follows, discovered from the data rather than declared.
Variant explorer
One process is written down. The data usually shows several hundred. Each one ranked by how often it runs and how much longer it takes than the clean route.
Diagnostics
Each deviating case replayed against the normative model, grouped by root cause.
Replenishment
The engine that decides what moves, and what it misses.

Predict

Control centre
The shift as it runs. The reasoning chain behind every prediction, traced back to the events it was drawn from.

Act

The decision surface
Inside the control centre. The interventions available on the day, ranked, each with its simulated outcome.
  1. 01

    Stop the clock at 06:30

    The floor is fine. The console has already called 9 of the 22 sale SKUs to outrun their cover, and named the station that runs dry at 08:59, 2.5 hours out.

  2. 02

    Approve a decision

    Every panel switches to that decision’s simulated day: the twin, the KPIs, the log. The baseline toggle puts the untouched morning back, so the two can be read against each other.

  3. 03

    Then approve the other one

    The pre-positioning move is the one the engine does not recommend, and approving it says so: a station still runs dry, the peak is still missed. A product that cannot report its own failure is not reporting anything.

Executive

Built for the person who owns the network.

One altitude up: which sites are exposed, what it costs if it lands, and whether anyone is already on it.

Loading the day…

The same screen the homepage shows as a still, with its numbers switched on: same day, same clock, read at a different altitude. Approve a decision in the console above and this one says an intervention is underway, because it is the same fork and not a second screen describing it. The site count says one because the replay is one distribution centre — a real portfolio ranks every site, and 3 invented ones would have made this look more like the pitch.

What happens after your library.

  1. 1

    Library · free, 3 days

    Your failure patterns, from your history.

  2. 2

    Pilot · one site

    Live data drives warnings to the shift manager. Nothing is automated or written back. We measure warning time and precision.

  3. 3

    Deployment

    In your environment, or operated by pAud under licence. Read-only access to source systems by default.

Talk to us